Bất động sản

Hoang Quan Group “overcame the epidemic” to bring the Binh Trung Dong HQC project to the finish line

On March 23, Hoang Quan Group said that the Ho Chi Minh City Department of Construction had announced the results of the inspection and acceptance of the completion of the construction of the Binh Trung Dong HQC project.

Hoang Quan Group
HQC Binh Trung Dong owns a prime location in Thu Duc City (old district 2 center).

HQC Binh Trung Dong project owns an airy living space with a diverse system of utilities, fully meeting the needs of modern residents. Right from the moment it was first launched and opened for sale, HQC Binh Trung Dong has received a lot of attention in the housing market in Ho Chi Minh City thanks to its outstanding advantages in location and price segment.

HQC Binh Trung Dong has a total investment capital of more than 354 billion VND with a total land area of ​​nearly 4,300m2, invested by Hoang Quan Real Estate Service Trading Consulting Joint Stock Company. The project is located in a total of 19.3ha belonging to Binh Trung Dong Residential Area Project, adjacent to 2 fronts of Nguyen Duy Trinh and Do Xuan Hop streets of Thu Duc City (old district 2 center), adjacent to primary school Nguyen Van Troi, located along the Saigon – Dau Giay highway and directly connected to the arterial traffic system and complete transport infrastructure in East Saigon.

Residents at HQC Binh Trung Dong can easily move to key areas in Ho Chi Minh City such as: District 1 center, Thu Thiem commercial area, Saigon South urban area with many facilities such as schools, Supermarkets, amusement parks, crowded residential areas…

Hoang Quan Group
From HQC Binh Trung Dong, residents can easily move to key areas of Ho Chi Minh City, Ho Chi Minh City. Thu Duc and surrounding areas

According to the approved decision, the project has a construction structure including 1 integrated block, 1 basement, 15 commercial and service floors and apartments built on an area of ​​4,299.8 m2, total construction area is 31,072.62 m2. In which, the 13-storey apartment complex provides 260 apartments (from floors 4 to 15); commercial service floors 3 floors (1 – 3 floors). The project block provides about 80% of apartments for social housing, 20% of apartments for commercial housing.

All apartments here are designed with a reasonable height, ventilation, modern design style, high aesthetics. HQC Binh Trung Dong is equipped with a security system, cameras operating throughout the building 24/7 and full internal facilities such as a shopping center, overflowing swimming pool on the 3rd floor, cinema system, room gym, spa, children’s play area and community house…

Hoang Quan Group
Standard internal and external utility system, meeting all the needs of residents of HQC Binh Trung Dong

The representative of HQC investor shared that, in the context of the stressful and complicated Covid-19 epidemic, HQC Binh Trung Dong and all employees of Hoang Quan Group still made great efforts to complete the project. high quality apartments.

Starting to invest in social housing development since 2013, until now, Hoang Quan Group has handed over all 8 projects, typically: HQC Plaza Project with 1,735 apartments in the fourth quarter of 2015, HQC Project Hoc Mon with 562 apartments and HQC Can Tho project with 818 units in the first quarter of 2017, Phu Tai HQC project with 306 apartments in March 2019, Ho Hoc Lam HQC project in April 2019 with 718 apartments , HQC Nha Trang Project with 1,002 apartments from the second quarter of 2020, Tra Vinh New Urban Area Project and Nam Phan Thiet New Urban Area Project…

This group affirmed, the successful acceptance and put into operation of HQC Binh Trung Dong project will prolong Hoang Quan’s handover chain of social housing, contribute to ensuring the realization of social security, continue. affirmed to be a pioneer investor, maintaining its leading position in the field of social housing in Vietnam.

Doan Phong

You are reading the article Hoang Quan Group “overcame the epidemic” to bring the Binh Trung Dong HQC project to the finish line
at Blogtuan.info – Source: vietnamnet.vn – Read the original article here

Back to top button