Life StyleXã Hội

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction

In the morning of April 28, Thu Thiem 2 bridge, connecting District 1 and Thu Thiem urban area, City. Thu Duc, Ho Chi Minh City was officially inaugurated after 7 years of waiting.

Thu Thiem 2 Bridge is one of the key projects of Ho Chi Minh City, so the people of the city are very excited. The bridge connecting the two banks of the Saigon River was inaugurated and officially opened to traffic at 3pm on the same day.

According to the HCM City Department of Transport, the completed Thu Thiem 2 bridge will contribute to reducing the load and traffic congestion for Nguyen Huu Canh Street and the Saigon River Tunnel, which is already overloaded.

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 1.

Thu Thiem 2 Bridge connecting the banks of the Saigon River is considered a new symbol of Ho Chi Minh City

In addition, Thu Thiem 2 Bridge is also considered as a new symbol of the city with artistic lighting design, expected to be an outstanding architectural highlight on the Saigon River day and night when completed.

Thu Thiem 2 Bridge has a total length of 1,465m, the bridge section is 885.7m long, including 6 lanes. The bridge has a cable-stayed design with the main tower bearing the 113m-high Dragon Bridge architecture.

The project was built in 2015 with an investment of more than 3,100 billion VND, expected to be completed in 2018. However, due to problems in capital and space, it was delayed, until September 2021, the new bridge was officially contracted. long when progress reaches 85% volume. After that, the investor and the contractor accelerated the construction and now Thu Thiem 2 bridge has been completed and put into use on the occasion of the 30/4 holiday.

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 2.

Thu Thiem Bridge 2 before driving time

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 3.

Thu Thiem 2 Bridge is designed with 6 lanes

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 4.

The lane from the city. Thu Duc goes to District 1

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 5.

Traffic lanes from District 1 to Ho Chi Minh City. Thu Duc

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 6.

From Thu Thiem 2 bridge, you can see the whole of Ho Chi Minh City

Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction - Photo 7.

People are happy because they will avoid traffic jams after Thu Thiem 2 bridge is open to traffic

https://kenh14.vn/tphcm-chinh-thuc-thong-xe-cau-thu-thiem-2-sau-7-nam-thi-cong-20220428154313224.chn

You are reading the article Ho Chi Minh City officially opened Thu Thiem 2 bridge after 7 years of construction
at Blogtuan.info – Source: Kenh14.Vn – Read the original article here

Back to top button