Business

Ho Chi Minh City put into operation the parallel road to Hanoi Highway

The Department of Transport of Ho Chi Minh City has just sent a document to the Hanoi Highway Construction Investment Joint Stock Company and the Center for Management of Road Traffic Infrastructure on the approval of the traffic organization plan. put into operation the parallel road on the left of Hanoi Highway, the section from Rach Chiec bridge to Vo Van Ngan street, Thu Duc city.

The parallel road on the left of Hanoi Highway, the section from Rach Chiec Bridge to Han Thuyen Street, Thu Duc City will organize two-way traffic of vehicles. In particular, the section from the road to the Power Transmission 4 to the 3rd Street is forbidden for trucks and passenger cars to circulate in two directions.

As for the section from Dang Van Bi to Han Thuyen, trucks and passenger cars are prohibited from traveling in the direction from Dang Van Bi to Han Thuyen.

On the left side of Hanoi Highway, the section from Han Thuyen Street to Nguyen Cong Tru Street organizes 2-way traffic of 2-wheelers and cars in the direction from Nguyen Cong Tru Street to Han Thuyen Street.

The parallel road on the left of Hanoi Highway, the section from Nguyen Cong Tru Street to Vo Van Ngan Street organizes two-way traffic of vehicles.

The parallel road on the left of Hanoi Highway, the section from Road No. 2 to Vo Van Ngan Street is forbidden to use semi-trailers in the direction from Road No. 2 to Vo Van Ngan Street, and in the opposite direction, semi-trailers are prohibited. -trailers circulate between 6:00 p.m. and 10:00 p.m.

The road parallel to the left of Hanoi Highway is forbidden to stop and park vehicles from Rach Chiec bridge to Tagore street, and to ban parking from Tagore street to Vo Van Ngan street.

The Department of Transport assigned Hanoi Highway Construction Investment Joint Stock Company to be responsible for completing the legal and procedural order to put the project into operation in accordance with regulations; assigned the Road Traffic Infrastructure Management Center to assist in the installation of the road traffic signal system in accordance with the plan approved by the Department.

As for the plan to organize traffic for the exploitation of the road parallel to the Hanoi Highway, the Department proposed the Hanoi Highway Construction Investment Joint Stock Company to coordinate with the People’s Committee of Thu Duc City to speed up the clearance work. equal to the section in front of Bac Rach Chiec residential area to complete the construction of the right parallel road to Hanoi Highway in accordance with the approved design documents./.


According to Ha Khanh

You are reading the article Ho Chi Minh City put into operation the parallel road to Hanoi Highway
at Blogtuan.info – Source: cafebiz.vn – Read the original article here

Back to top button