Hanoi concludes that ‘no violations have been detected’ at project 61 Tran Phu

The Hanoi People’s Committee has just sent a report to the Ministry of Construction on the review of the total ground and architectural plan of the multi-function project Postef, 61 Tran Phu (Dien Bien ward, Ba Dinh district).

‘Doesn’t increase traffic pressure’

According to the report, about the planning orientation in the area, according to the Conclusion No. 54-KL/TU dated December 28, 2012 of the Politburo and related regulations, the Prime Minister approved the Adjustment of the master plan. detail of Ba Dinh political center (Decision No. 2411/QD-TTg dated December 10, 2013). The above land (lot G1) has the following orientation: Moving the factory, building it into a commercial, service, and high-class hotel complex; make the most of underground space for commerce, services, technical infrastructure and parking spaces. Architectural planning criteria include a maximum of 11 floors, construction density of 50%.

The report of the City People’s Committee also said that, related to the planning plan, construction architecture, processes and procedures, the Department of Planning and Economics has approved the total site and the architectural plan of the work to ensure Full regulatory process and publicity and transparency 2014 of the City People’s Committee stated: “The postal equipment factory area is completely relocated to build mixed-service works”.

Regarding land use, functions and architectural planning criteria of the work, the project was approved in accordance with the project of Adjustment of the detailed planning of the Ba Dinh political center area, scale 1/2000 approved by the Prime Minister. Government approved in Decision 2411/QD-TTg dated 10/12/2013.

Also according to the above report, based on the content of the investor’s investment proposal, the Department of Planning and Economics has reported to the Hanoi People’s Committee and asked for the opinion of the Ministry of Construction. On the basis of the direction of the Ministry of Construction, the People’s Committee of Hanoi, the Department of Planning and Economic has consulted the Council of Architecture – City Planning; propose the local government to consult the residential community…Basic opinions agree on the policy of investment and construction of multi-function works in the land area 61 Tran Phu.

In terms of landscape architecture space, the Postef building is 11 floors/42.9m high (equivalent to the National Assembly building), the podium has a setback of 17m, and the tower block has a setback of 28m. compared to the Hung Vuong road is suitable.

Regarding the underground works, the report stated, according to the Adjustment of detailed planning of Ba Dinh political center area, the rate of 1/2000 approved by the Prime Minister, in the above land area, there is an orientation for maximum exploitation. underground space for commerce, services, technical infrastructure and parking.

The underground part of the approved work has 6 basements, in which the arrangement of office, service, technical and parking functions is consistent with the orientation of Adjusting the detailed planning of the political center of Ba Ria – Vung Tau. Communal house, ensuring within the legal land use boundary… The underground part of the work has been granted a construction permit by the Hanoi Department of Construction in 2020.

In the impact assessment of the project, the report of Hanoi city said that the project is within the scope and boundaries of the project. Adjustment of detailed planning of Ba Dinh political center area, scale 1/2000 . Functions and criteria of land use planning of the project have been organized, appraised, analyzed and evaluated by the units that organize and appraise the project to analyze, evaluate the level of influence, and balance social and technical infrastructure in the area. before giving planning orientation and submitting to the Prime Minister for approval.

“The approved project has the functions and architectural planning criteria in line with the project of Adjusting the detailed planning of Ba Dinh political center approved by the Prime Minister, therefore, it will not do this. increasing pressure on the traffic system and technical infrastructure of the surrounding area. On the other hand, at the project land, a land fund of 1,555 square meters has been set aside to expand the surrounding roads according to the planning, which will actively contribute to the increase of traffic land area, improve the traffic capacity of the roads in the area. region,” the report stated.

‘No errors detected’

Regarding the preservation and promotion of the value of the bas-relief of the bas-relief “Capital soldiers shot down an American plane”, the report stated, according to the inventory of relics in Ba Dinh district approved by the City People’s Committee (Decision No. Decision No. 5745/QD-UBND dated October 14, 2016), location 61 Tran Phu, where the relief is located, is not on the inventory of relics. However, the bas-relief marks the revolutionary historical event of the army and people of the capital during the resistance war against the US, so it is necessary to keep the relief.

“The results of the inspection and review show that the investment project to build a multi-function project Postef at the land area at 61 Tran Phu street, Dien Bien ward, Ba Dinh district is implemented in accordance with the planning and architecture. approved. Functions and criteria of land use planning have been established and appraised by the organizing units. enjoy and balance social and technical infrastructure in the area before giving planning orientation and submitting to the Prime Minister for approval. Process and procedures for investment management, land management in accordance with the provisions of law; have not detected any errors in processes and procedures as well as those of relevant organizations and individuals in the process of handling dossiers. Investment projects can continue to be implemented in accordance with the law,” the report of the Hanoi People’s Committee stated.

The document of Hanoi city said that, receiving opinions from the public, experts …, on May 9, the investor had a written proposal to re-study the total ground and architectural plan. the project in the direction of reducing the number of basements, preserving the bas-relief and organizing a competition for architectural plans.

In order to have a basis for a comprehensive and careful review of the project’s impact, the Party Committee of the City People’s Committee has reported to the Standing Committee of the City Party Committee to consider and direct the implementation of a number of contents before allowing investors to continue. project implementation.

Specifically, on the planning plan, construction architecture, the city assigned the Department of Planning and Economics to assume the prime responsibility and coordinate with the Vietnam Association of Architects and relevant units to organize a council of experts and scientists. .. research, evaluate planning and architectural plans, work with investors to agree on measures, organize contests to select architectural plans that contribute to the space and landscape of the area in the direction reduce the number of basements, standardize the functions and functions of the building.

The planning and architectural plans will then be fully and widely announced to the public, ensuring publicity, transparency and consensus.

Regarding the bas-relief, the Department of Planning and Economics was assigned to consider and evaluate the project’s planning and architecture plan, coordinate with the Department of Culture and Sports, Ba Dinh District People’s Committee, and the investor to study the conservation plan and keep it intact. state of the art, scale, and content.

Based on the guidelines and direction of the competent authority, the City People’s Committee will direct the city’s departments and agencies to implement, ensuring synchronization in reviewing and evaluating the project’s planning and architectural plans; Proposing appropriate solutions and solutions.

According to the report, based on the approved Adjustment of the detailed planning of the Ba Dinh Political Center and related regulations, the Department of Planning and Economics has approved the total ground and the architectural plan of the multi-functional public works. (Commercial complex, service, high-class hotel) at the above land area attached with Document No. 530/QHKT-TMB-PAKT dated January 25, 2017 with architectural planning criteria: Construction density about 50%; the number of floors is 11 floating floors + technical ladders and has 6 basements; the total floating floor area is about 32,306.6 square meters, the total basement floor area is about 43,023.3 square meters; building height 42.9 meters.