Business

A close-up of the 2 km road ‘stuffed’ with 40 buildings in Hanoi, which is marked by mistakes

According to the Inspectorate of the Ministry of Construction, in 1998, the Prime Minister approved the adjustment of the general planning of Hanoi Capital until 2020 (Decision No. 108). In 2011, the Prime Minister approved the general planning of Hanoi Capital (Decision No. 1259). For the two sides of Le Van Luong, To Huu, Nguyen Thanh Binh roads, Trung Hoa – Nhan Chinh new urban area, to concretize the general planning, the Hanoi People’s Committee has made, appraised and approved the detailed planning projects at the scale of 1/5000, 1/2000, 1/500 since 1999; urban zoning plans from 2013-2015 as a basis for elaboration, appraisal and approval of detailed planning, urban design, regulations on management of planning, architecture, construction investment management, licensing construction permit. However, many units adjusted the planning wrongly, stuffing buildings increased 6 times.

You are reading the article A close-up of the 2 km road ‘stuffed’ with 40 buildings in Hanoi, which is marked by mistakes
at Blogtuan.info – Source: cafebiz.vn – Read the original article here

Back to top button