Giao thôngTHỜI SỰ

The metro construction site re-establishes the street surface in the center of Ho Chi Minh City


DJI 0037 2 1648871537

In April, at the construction site of Ben Thanh underground station at the corner of Le Loi street intersecting with Pasteur and Nam Ky Khoi Nghia streets, dozens of workers and machines were busy working to return the original condition.

In 2016, the Le Loi street area was fenced off in 2016 for the construction of package 1A (the underground section from the Opera House station to Ben Thanh station, 515 m long). Currently, the work is more than 95%. About a year ago, a part of the ground on Le Loi – Nguyen Hue, opposite the City Theater was paid by the construction unit to re-ground.

You are reading the article The metro construction site re-establishes the street surface in the center of Ho Chi Minh City
at Blogtuan.info – Source: vnexpress.net – Read the original article here

Back to top button